The most complete steps to decorate the blank room

2022-07-22
  • Detail

Many owners are worried about the decoration of rough houses after they hand over their houses and don't know how to start. However, the decoration company felt that it had become very limited, so it simply came by itself. Then, let's introduce the most complete steps to decorate the blank house in history

many owners are worried about the decoration of rough houses after they hand over their houses and do not know how to start. However, the decoration company felt that it had become very limited, so it simply came by itself. Then, let's introduce the most complete steps to decorate the blank house in history

preliminary design of the steps of decorating the blank room

in the preliminary design, you should make a detailed measurement of your room. Don't be lazy. You'd better measure it yourself. The measurement mainly includes: clarifying the area involved in the decoration process. In particular, the tiling area, wall paint area, wallpaper area and floor area; Specify the main wall dimensions. Especially in the future, we need to design the wall size of furniture

the main body demolition and reconstruction of the steps of decorating the blank room

in the construction stage, the main body demolition and reconstruction is the first project, mainly including wall demolition, wall building, wall peeling, heating demolition, plastic steel window replacement, etc. To put it bluntly, the main demolition is to put up the framework of the construction site first

the steps of decorating the roughcast house water and electricity transformation

before the water circuit transformation, the demolition and transformation of the main structure should be basically completed. The first measurement of cabinets should also be carried out between the two links of hydropower transformation and main body demolition and reconstruction. In fact, the first measurement of the so-called cabinet has no actual content, because the wall and ground have not been treated, the cabinet designer cannot give specific design dimensions, but just put forward some relevant suggestions on the location of the water inlet and lampblack socket reserved by the developer

mainly includes: 1. Check whether the position of the lampblack socket affects the installation of the lampblack in the future; 2. Check whether the position of the water meter is appropriate; 3. Check whether the position of the water inlet is convenient for installing the water tank in the future. For the first measurement of the cabinet, you can complete it by yourself. After the waterway reconstruction is completed, it is best to do the waterproofing of the bathroom immediately. The kitchen generally does not need to be waterproof

before decoration, the mobilization time of main materials, such as ceramic tiles, large core boards and so on, should be after the water and electricity transformation. Because if the circuit transformation involves slotting on the ground and the stacking position of ceramic tiles and large core boards is improper, it is very troublesome for workers to move around

woodworking in the steps of decorating the blank room

woodworking, bricklaying and oiling are the construction links “ Three brothers ”, The basic order of appearance is: Watt &mdash& mdash; Wood &mdash& mdash; Oil. The basic appearance principle is &mdash& mdash; Whoever is dirty will go first& ldquo; Whoever is dirty goes first ” It is also one of the basic principles that determine the order of home decoration

in fact, carpentry such as wrapping riser, making decorative ceiling and plastering line can also be considered as a detail of the main body demolition and reconstruction. It does not conflict with the water circuit reconstruction itself, and sometimes it needs some cooperation

tiling of the steps of decorating the blank room

if the workers are busy, the foreman will generally be in “ Bricklayer boss ” Let “ Carpenter's dick ” It's normal to enter, because there is no conflict between the two. In the process of bricklaying, the installation of the following three links is also involved: 1. The installation of the door stone and the marble windowsill. The installation of the door stone can be completed together with the floor tile, or after the floor tile is paved. The marble windowsill is generally installed after the window cover is completed. The marble installer will prepare glass glue and conveniently seal the marble and window cover with glass glue. 2. Installation of floor drain. Floor drain is the first to appear in home decoration hardware, because it should be installed together with floor tiles. We should buy floor drains as soon as possible. 3. Installation of range hood. The range hood is the first appliance to appear. After the kitchen wall and floor tiles are paved, you can consider installing the range hood. When the bricklayer leaves the site, you can make an appointment for the second measurement of the cabinet. To be exact, after the kitchen wall and floor tiles are pasted and the range hood is installed, you can make an appointment for the second measurement of the cabinet

the steps of decorating the rough room: painting the wall

the oiler enters the site, mainly completing the wall base treatment, painting the top coat, painting the woodworker's furniture, etc. To prepare the wallpaper, just ask the oiler to do the base treatment on the wall where the wallpaper is planned. As for whether to keep the last coat of finish paint, I don't think it's necessary to be too serious. From my experience of decoration, the significance of keeping one coat of finish paint is not great, because the subsequent operation is no dirtier than painting

generally understood decoration is only decoration “ Construction link ”, In fact, the decoration “ Installation link ” It is also the focus of decoration. If you say “ Design link ” It's about what our future home looks like “ Conception ” After a while, then “ Construction link ” Is to take our home “ Packaging ” For a moment, really say “ Prepare ” Almost everything is “ Installation &rdquo

steps to decorate the rough room: kitchen and bathroom ceiling

cabinet ceiling, as the beginning of the installation process, is still continuing the home “ Packaging ”. At the same time as the ceiling of kitchen and bathroom, the damp proof ceiling lamp and exhaust fan (Yuba) of kitchen and bathroom should have been bought. It is best to install the ceiling lamp and exhaust fan (Yuba) in the kitchen and bathroom at the same time, or leave thread ends and openings

believe in professional construction, the installation level of the manufacturer, and the products of assembly line operation. Most of them are slightly better than the manual work of the decoration team workers. Decoration is like a game, gambling on workers' skills. In fact, each link of decoration is very independent. The key is to accurately grasp the selection of materials, master some simple construction processes, and deal with the relationship with workers, etc. Decoration quality always comes first, which is the main contradiction and the general principle

the steps of decorating the rough room: kitchen cabinet installation

after the ceiling is finished, you can ask the cabinet to be installed on the door. If it goes well, it can be completed in one day. At the same time, there are water tanks (excluding plumbing parts) and gas stoves installed. It is best to coordinate with the property to connect the gas before the installation of cabinets, because the gas stoves need to be tested after installation